What turnkey means at Aurum Group
A luxury modular home is not a product bought from a brochure: it is a project that must be managed. The difference between a successful outcome and a build that runs into difficulties almost always comes down to how many parties are involved and who is accountable when something does not fit. That is why we work with a single contract and a single person responsible for the entire process.
This scope is agreed in writing before work begins, and in a complete turnkey service it covers:
| Phase | What we take on |
|---|---|
| Plot feasibility | Land classification, buildability, site coverage, setbacks and access for transport and crane |
| Architecture and engineering | Preliminary design, execution project, structure, installations, official approval and site supervision |
| Permitting | Municipal building permit and document management through to first occupancy |
| Foundations | Geotechnical survey, earthworks and slab or footings |
| Manufacturing | Structure, envelope, insulation, joinery and installations carried out in the workshop |
| Transport and assembly | Special transport, crane, assembly and joint sealing on the foundations |
| Connections and exteriors | Water, drainage, electricity, telecommunications, access and landscaping |
| Finishes and interior design | Flooring, interior joinery, bathrooms, kitchen, bespoke furniture and home automation |
| Handover | Systems testing, commissioning, building log book and handover of keys |
Typologies we design
Modular construction can accommodate virtually any high-end residential brief. These are the typologies we work with most frequently:
- Luxury modular villa. A large, single or multi-storey home with generous spans, floor-to-ceiling windows and living spaces opening onto the outdoors.
- Exclusive modular chalet. A detached single-family home on its own plot, with a full day and night layout and an integrated garage.
- Single-storey modular home. A stair-free layout that is accessible and easy to maintain, well suited to large plots and long-term use.
- Modular extension. Modules added to an existing home to gain bedrooms, a study, gym or guest area, with minimal works to the original house.
- Housing development. Several modular homes built as part of the same scheme, taking advantage of workshop repetition without sacrificing variation between units.
None of these forms part of a closed catalogue: in every case, a unique home is designed for a specific plot. You can view the materials, systems and finish levels we work with in the catalogue and specifications document.
Specification befitting the luxury segment
Workshop manufacturing is the best guarantee of a well-executed building envelope: continuous insulation and airtightness — the two factors that most affect a home's actual energy consumption — are installed and verified to a precision that is difficult to achieve on site. On this foundation, the specification typical of our projects includes:
| System | Standard solution |
|---|---|
| Structure | Galvanised steel frame or SIP panels, depending on the project, climate and plot |
| External joinery | High-performance units with thermal break and triple glazing |
| Climate control | Air-source heat pump with underfloor heating and cooling |
| Ventilation | Mechanical ventilation with heat recovery and filtration |
| Energy | Photovoltaic self-consumption, with optional storage |
| Control | Home automation for climate, lighting, access and security |
| Interior design | Bespoke furniture and joinery, coordinated from the workshop |
The choice between steel frame and SIP panels is a technical decision, not a commercial one: it depends on the geometry of the project and the spans to be covered, the climate zone, the accessibility of the plot and the acoustic and fire-resistance requirements. That analysis forms part of the project. We explain it in detail in the complete guide to luxury modular homes.
Energy efficiency and certification
Any newly built home in Spain must comply with the Código Técnico de la Edificación (Spanish Technical Building Code) in its basic energy-saving document and must be handed over with its energy performance certificate, the same one that later accompanies the title deed and any letting or sale. In the luxury segment, that requirement falls short as an objective: what matters is the actual energy consumption of the finished home, and that is where factory manufacturing makes the difference.
The reason is simple. The consumption of a well-designed home is determined by three factors — continuous insulation, the absence of thermal bridges and airtightness — and all three are executed better under cover, with the envelope assembled on a workbench, than outdoors and by different trades. On that basis, we work with:
- High-performance envelope. Continuous insulation on the façade, roof and floor, with junctions resolved at the design stage to eliminate thermal bridges rather than correct them afterwards.
- Verified, not assumed, airtightness. Air tightness can be verified with a pressurisation test — blower door — before the finishes are closed, which is the only moment when a leak can still be sealed without breaking anything.
- Demand first, then equipment. What the home needs is reduced first — orientation, solar shading, triple-glazed windows — and only then are the aerothermal system and heat-recovery ventilation sized. Doing it the other way round makes the installation more expensive without lowering the bill.
- Own generation. Photovoltaic self-consumption, with optional storage, to cover part of the remaining demand.
- The target, in writing. The performance level being pursued — up to approaching a nearly zero-energy building — is agreed at the preliminary design stage, as it determines thicknesses, window systems and installations, and therefore the budget. What is not set at the outset becomes an extra at the end.
Industrialised construction also has an environmental advantage that appears on no certificate: the factory works with fixed measurements and sorted offcuts, so it generates considerably less waste than an equivalent project built entirely on site, and it reduces the months of machinery, noise and traffic in the surrounding area. In an established residential area, that is appreciated by the neighbourhood and, sometimes, by the local council too. The detail of how each requirement is met is set out in the complete guide to luxury modular homes.
The process, step by step
- 1. Initial consultation. We review your plot and your requirements. Free of charge and with no obligation.
- 2. Planning feasibility. We check what the local planning regulations allow before drawing anything. This is the verification that avoids the most unpleasant surprises.
- 3. Preliminary design and proposal. Initial floor plans and massing, with scope, itemised budget and schedule.
- 4. Detailed design (execution project). Full definition of architecture, structure, services and finishes, including the module breakdown.
- 5. Permitting and manufacturing in parallel. While the local council processes the permit and the plot foundations are laid, the modules are already being manufactured.
- 6. Assembly, finishing and handover. Assembly onto the foundations, final connections, testing, interior design and handover of the keys.
Modular versus traditional construction
Those who have got this far are not usually choosing between two module manufacturers: they are deciding whether building their home in a factory makes sense. The honest comparison is not that one method is better, but that both methods fail at different points.
| Luxury modular home | Traditional construction | |
|---|---|---|
| Where quality is decided | In the workshop, under cover and against a plan, with junctions checked before the module is closed. | On site, outdoors and by trades that pass through the site for a few weeks each. |
| The weather | Affects the day of assembly, not the construction itself: the factory produces the same in January as in July. | Affects the entire schedule. Rain and cold halt entire phases. |
| Energy performance | Airtightness is a measured figure, because the envelope is built and tested under controlled conditions. | Achievable, but depends on every junction being executed correctly, on site and first time. |
| Timeframe | The home and the plot progress in parallel; the airtightness result arrives within days. | Strictly sequential: each phase waits for the previous one to finish. |
| Budget certainty | The manufactured part is a fixed specification. Deviation is concentrated on the plot. | Deviation is spread throughout the entire project and appears late. |
| Changes midway through the project | Inexpensive until the breakdown of components is finalised; expensive from that point onwards. This is the real trade-off of the method. | Possible later on, although every late change on site is paid for twice. |
| Plot conditions | Access, crane positioning and module width are hard limits, and these are checked before the design stage. | Almost any access will do, as materials arrive in small pieces. |
| Planning permission and regulations | Identical. It is processed as a permanent dwelling: the Código Técnico (Spanish Technical Building Code) and the local council's by-laws apply equally, with no modular category or shortcut. | Identical. |
Modular, prefabricated or industrialised
All three words are used as synonyms, and anyone searching for luxury prefabricated houses, industrialised housing or luxury modular housing is usually looking for the same thing: a house whose main part is manufactured in a workshop and then assembled on the plot. However, they do not describe exactly the same thing, and the difference matters when comparing offers.
- The plot. Slope, ground type, access for special transport and crane, and distance to utility connections. This is the variable that most affects a budget, and the only one that cannot be estimated without seeing it.
- The floor area and number of storeys. Cost does not increase in a straight line with square metres: a second storey requires the structure, staircase and means of escape to be reviewed.
- The construction system. Steel frame and SIP panels solve different problems; the choice responds to the project, the plot and the climate, not to price.
What turns any of these into a luxury home is not the word used, but the project itself: bespoke architecture for the plot, integrated interior design, a building envelope that genuinely performs, and top-tier finishes. For legal, licensing, mortgage and warranty purposes, a modular home anchored to foundations is a home like any other, as detailed below.
What determines the price
This is the first question in almost every enquiry, and the one that is worst answered online, because any figure quoted in isolation is misleading. In the luxury segment there is no price per square metre that applies to every case: the same floor area can vary completely in cost depending on the structural system, the level of finish and, above all, on what the plot requires. That is why the budget is set on the specific project, not on a catalogue.
These are the variables that genuinely determine the final figure for a luxury modular home:
- The plot. Slope, ground type, access for special transport and crane, and distance to utility connections. This is the variable that most affects a budget, and the only one that cannot be estimated without seeing it.
- The floor area and number of storeys. Cost does not increase in a straight line with square metres: a second storey requires the structure, staircase and means of escape to be reviewed.
- The construction system. Steel frame and SIP panels solve different problems; the choice responds to the project, the plot and the climate, not to price.
- The level of finish and interior design. This is by far the widest margin: joinery, flooring, bathrooms, kitchen, bespoke furniture and home automation.
- Building services and efficiency. Air-source heat pumps, heat-recovery ventilation and photovoltaics increase the initial investment and reduce running costs throughout the life of the home.
- What lies outside the module. Permits, geotechnical survey, foundations, utility connections and plot groundworks. These are part of the home, not extras.
If you would like to see the detail of each item before requesting a proposal, we have covered this in the luxury modular homes guide.
Where we build
We work from Spain for clients throughout Europe, and we provide service in eight languages —Spanish, English, French, German, Russian, Polish, Dutch and Albanian—, with the project documentation in the client's own language.
Markets served: Spain, Germany, Austria, Switzerland, France, Belgium, the Netherlands and Luxembourg, Italy, Portugal, Greece, Ireland, the United Kingdom, Poland, Russia and Albania. Each country has its own technical guide to permits, building codes and climate, linked from its name.
In Spain we build throughout the entire country, including the islands (what changes when building here is explained in luxury modular home in Spain). The home is designed and manufactured in the same way anywhere in the country: what changes from one area to another is the local council procedures, the climate requirements of the Código Técnico (Spanish Technical Building Code) and the site access conditions. This is precisely what is checked during the feasibility phase, before any designs are drawn up:
- Andalusia and the Costa del Sol. Málaga, Marbella, Estepona, Sotogrande and the rest of the coastline, where the coastal protection easement over the maritime-terrestrial public domain determines where the home can be sited.
- Community of Madrid. Low-density plots in the metropolitan belt, with municipal by-laws setting site coverage, setbacks and height with very little leeway.
- Valencian Community and Murcia. Costa Blanca, Valencia and Mar Menor, with many sloping plots and narrow access roads that must be checked before arranging special transport and crane access.
- Catalonia and the Costa Brava. Barcelona, the Baix Empordà and the Girona coastline, where landscape protection measures are common and affect volume and materials.
- Balearic and Canary Islands. Mallorca, Ibiza, Menorca and the Canary Islands, where sea transport of the modules is factored into the schedule from day one.
- Atlantic north. Basque Country, Cantabria, Asturias and Galicia, with weatherproofing and damp-protection requirements more demanding than in the south.
- Navarre, La Rioja, Aragón, the two Castiles and Extremadura. Continental climate and, in mountain areas, snow loads and thermal swings that are addressed in the design of the building envelope.
If you are also considering buying a luxury property in Spain from abroad, we have prepared market-specific guides covering the legal process, taxes and financing for non-residents.
Guarantees, regulations and financing
This is worth clarifying from the outset, as it is the doubt that most weighs on the decision: a modular home anchored to a permanent foundation is a home like any other in every legal, tax and land registry respect. It is neither a demountable installation nor a prefabricated house for temporary use, and there is no separate modular regulation: it is designed, processed, inspected and delivered under the same rules as any conventional new build.
- Council planning permission, not a special category. Building permission from the local council based on an approved project, subject to the same requirements on buildability, site coverage, setbacks and height that apply to any home on that plot.
- Guarantees under the Ley de Ordenación de la Edificación (Spanish Building Regulation Act). The periods the law sets for any new build: one year for finishing defects, three for those affecting habitability, and ten for those affecting the structure.
- Building insurance. Those required by law for property development, including ten-year insurance against structural damage. The law separately covers the case of a self-developer building a single-family home for their own use, so on each project the applicable category is confirmed and set out in writing.
- Handover documentation. Certificate of completion, first occupancy licence, energy performance certificate and building log book, together with the warranties from the manufacturers of installations and equipment.
- Title deed and Land Registry. A declaration of new build before a notary and registration with the Land Registry, exactly as with a home built piece by piece on the plot.
- Mortgage under normal conditions. As a registered property, the home can be financed like any other. When the client owns the plot, the usual route is a self-development mortgage, with drawdowns released against certified stages of work; the bank requires an approved project, planning permission, an itemised budget and a schedule, which is exactly the documentation provided at the preliminary design stage.
The objection regarding valuation falls away for the same reason: the valuer assesses a single-family home on urban land, not an industrial product. What is worth anticipating with the bank is the payment schedule, since workshop manufacturing brings forward outlays that, in traditional construction, would only be due later. This alignment between the construction schedule and the financing schedule is addressed in the proposal, before anything is signed.
Why Aurum Group
- A single point of contact. One contract and one person responsible from the plot's feasibility through to handover, with no passing of blame between trades.
- In-house architecture. An original design for each plot, not the adaptation of a catalogue model.
- Integrated interior design. Developed within the project itself, not afterwards, so that joinery, furniture and fittings arrive coordinated from the workshop.
- Itemised budget. Broken down line by line, with exclusions stated in writing, so that the final price resembles the initial one.
- A European outlook. Experience with non-resident buyers and with the documentation required by each market.
Current project: modular home in Pinoso (Alicante)
Our most recent project is a single-storey modular detached house in Pinoso, in inland Alicante province. Handover of the keys is scheduled for 20 November 2026, and it is a good example of the short timeframe made possible by factory manufacturing whilst the plot is being prepared.
| Project | Details |
|---|---|
| Type | Single-storey detached house |
| Location | Pinoso, Alicante (Comunitat Valenciana, Spain) |
| Floor area | 150 m², single storey |
| Status | Under construction · handover scheduled for 20 November 2026 |
Frequently asked questions
What exactly does a turnkey luxury modular home include?
The scope is agreed in writing in the proposal for each project. A complete turnkey service covers architecture and engineering, permit processing, foundations, manufacturing, transport and assembly, services, utility connections, finishes and interior design, through to handover ready to move into. When comparing quotes, check which items are excluded: foundations, utility connections, permits and site development are the ones most often left out.
Do you build on my plot?
Yes, that is the usual starting point. Before designing, we check the land classification, the available buildable area and site coverage, the setback requirements and access for special transport and cranes. If you do not yet have a plot, this analysis can be carried out on those you are considering before purchase.
Can a luxury modular home be designed entirely to a bespoke specification?
Yes. We do not work from a fixed catalogue of models: each home is designed with its own architecture, layout and interior design, tailored to the plot, orientation, views and local regulations. Modularity gives the project structure, it does not limit it.
Up until when can changes be made to the project?
You have freedom to make changes during the preliminary design and the detailed design (execution project). Once the module breakdown is finalised and manufacturing has begun, structural changes are no longer feasible, as the workshop works to fixed measurements; with finishes and interior design, however, there remains scope for changes until later stages.
Can a modular home be mortgaged?
Yes. It is a permanent home anchored to permanent foundations, it is registered in the Land Registry like any other property, and it can be financed under the same conditions. For the valuation, the standard technical documentation is provided: the approved project, the permit, certifications and schedule.
What guarantees come with the delivered home?
Those established by the Ley de Ordenación de la Edificación (Spanish Building Regulation Act) for any new build, with its terms covering finishes, habitability and structure, plus the compulsory building insurance and the guarantees provided by the manufacturers of fittings and equipment. Everything is set out in the handover documentation together with the building log book.
In which countries do you build luxury modular homes?
In Spain and in the main European markets: Germany, Austria, Switzerland, France, Belgium, the Netherlands and Luxembourg, Italy, Portugal, Greece, Ireland, the United Kingdom, Poland, Russia and Albania. We provide service in eight languages.
How does the process begin, and is there a cost for the first consultation?
The first consultation is free and without obligation. We review the plot and your requirements brief, discuss planning feasibility and, if it is a good fit, prepare a proposal with scope, an itemised budget and a timeline.
How much does a luxury modular home cost?
There is no price per square metre that applies to the entire segment. The figure depends on the plot, the floor area and number of storeys, the construction system, the level of finish and the items that fall outside the module: permits, geotechnical survey, foundations, utility connections and groundworks. The budget is set on the specific project and delivered as a line-by-line breakdown, with the exclusions in writing, as early as the preliminary design stage.
How long does a luxury modular home take?
The specific timeline is set out in the proposal for each project, as it depends on the surface area, the construction system and, above all, the local council granting the licence: this is the stage with the most variability and the only one that does not depend on the construction company. What shortens the timeframe compared with traditional building work is not working faster, but working in parallel: the modules are manufactured in the workshop whilst the licence is being processed and the plot's foundations are being laid, and assembly on the foundations is completed within days or a few weeks. The full timeline, stage by stage, can be found in the guide to luxury modular homes.
What energy rating can a luxury modular home achieve?
The rating on the certificate is not determined by the construction method, but by the design: it depends on the building envelope, the joinery, the installations and the climate zone, and is calculated for the specific home. What workshop manufacturing brings is that continuous insulation, the elimination of thermal bridges and airtightness are executed and verified under controlled conditions — and these are precisely the factors that determine the outcome. The performance level being sought is agreed at the preliminary design stage, as it dictates thicknesses, joinery and installations. Promising a rating before a project exists would not be a serious claim.
Is a modular home cheaper than traditional construction?
Not necessarily, and whoever promises this is usually comparing different things. In the luxury segment, the saving lies not in the price per square metre, but in the timeline, in the certainty of the budget and in the running cost of the home over decades: the manufactured portion is a fixed specification, so any deviation is concentrated in the plot rather than spread across the entire build. The most common comparison error is setting the price of a module against that of a finished home; they are not the same thing. Ask for an itemised breakdown by section and the exclusions in writing for both quotes.
Is a luxury modular home the same as a prefabricated house?
In practice, people search for them as synonyms, but they are not exactly the same thing. "Prefabricated" simply means that the components arrive ready-made from the factory and is usually associated with catalogue models; a luxury modular home is designed to measure for the plot, manufactured in a workshop in volumes or panels with the structure, insulation and installations already completed, and anchored to permanent foundations. For legal purposes, it is a conventional home: building permit, title deed, Land Registry entry and mortgage under the same conditions.
Do you build throughout Spain?
Yes, throughout the country, including the islands. The home is designed and manufactured in the same way anywhere in the country; what changes is the municipal permitting process, the climate requirements of the Código Técnico de la Edificación (Spanish Technical Building Code) and site access for special transport and crane. On the islands, sea transport of the modules is also factored into the schedule. All of this is checked during the feasibility phase, before anything is drawn.