Spain · Europe

Luxury modular homes, turnkey

We design, manufacture and deliver bespoke luxury modular homes: our own architecture tailored to your plot, industrial workshop manufacturing with steel frame or SIP panels, interior design integrated into the same process, and a single point of contact from the initial analysis through to handover of the keys.

Aurum Group — Your luxury modular home, faster, more efficient, more Aurum. We design, build and deliver turnkey luxury modular homes.
An Aurum Group luxury modular home: in-house architecture, factory manufacturing in steel frame or SIP panels, and assembly on the client's own plot.
Home › Luxury modular homes

What turnkey means at Aurum Group

A luxury modular home is not a product bought from a brochure: it is a project that must be managed. The difference between a successful outcome and a build that runs into difficulties almost always comes down to how many parties are involved and who is accountable when something does not fit. That is why we work with a single contract and a single person responsible for the entire process.

This scope is agreed in writing before work begins, and in a complete turnkey service it covers:

PhaseWhat we take on
Plot feasibilityLand classification, buildability, site coverage, setbacks and access for transport and crane
Architecture and engineeringPreliminary design, execution project, structure, installations, official approval and site supervision
PermittingMunicipal building permit and document management through to first occupancy
FoundationsGeotechnical survey, earthworks and slab or footings
ManufacturingStructure, envelope, insulation, joinery and installations carried out in the workshop
Transport and assemblySpecial transport, crane, assembly and joint sealing on the foundations
Connections and exteriorsWater, drainage, electricity, telecommunications, access and landscaping
Finishes and interior designFlooring, interior joinery, bathrooms, kitchen, bespoke furniture and home automation
HandoverSystems testing, commissioning, building log book and handover of keys
When comparing quotes for modular homes, what matters is not the price of the module but what is left out of it. Foundations, utility connections, permits and plot groundworks are the items most frequently excluded from a quote, and the ones that most often push up the final cost. Always ask for the full breakdown.

Typologies we design

Modular construction can accommodate virtually any high-end residential brief. These are the typologies we work with most frequently:

None of these forms part of a closed catalogue: in every case, a unique home is designed for a specific plot. You can view the materials, systems and finish levels we work with in the catalogue and specifications document.

Specification befitting the luxury segment

Workshop manufacturing is the best guarantee of a well-executed building envelope: continuous insulation and airtightness — the two factors that most affect a home's actual energy consumption — are installed and verified to a precision that is difficult to achieve on site. On this foundation, the specification typical of our projects includes:

SystemStandard solution
StructureGalvanised steel frame or SIP panels, depending on the project, climate and plot
External joineryHigh-performance units with thermal break and triple glazing
Climate controlAir-source heat pump with underfloor heating and cooling
VentilationMechanical ventilation with heat recovery and filtration
EnergyPhotovoltaic self-consumption, with optional storage
ControlHome automation for climate, lighting, access and security
Interior designBespoke furniture and joinery, coordinated from the workshop

The choice between steel frame and SIP panels is a technical decision, not a commercial one: it depends on the geometry of the project and the spans to be covered, the climate zone, the accessibility of the plot and the acoustic and fire-resistance requirements. That analysis forms part of the project. We explain it in detail in the complete guide to luxury modular homes.

Energy efficiency and certification

Any newly built home in Spain must comply with the Código Técnico de la Edificación (Spanish Technical Building Code) in its basic energy-saving document and must be handed over with its energy performance certificate, the same one that later accompanies the title deed and any letting or sale. In the luxury segment, that requirement falls short as an objective: what matters is the actual energy consumption of the finished home, and that is where factory manufacturing makes the difference.

The reason is simple. The consumption of a well-designed home is determined by three factors — continuous insulation, the absence of thermal bridges and airtightness — and all three are executed better under cover, with the envelope assembled on a workbench, than outdoors and by different trades. On that basis, we work with:

Industrialised construction also has an environmental advantage that appears on no certificate: the factory works with fixed measurements and sorted offcuts, so it generates considerably less waste than an equivalent project built entirely on site, and it reduces the months of machinery, noise and traffic in the surrounding area. In an established residential area, that is appreciated by the neighbourhood and, sometimes, by the local council too. The detail of how each requirement is met is set out in the complete guide to luxury modular homes.

The process, step by step

The time advantage of a modular home does not come from working faster, but from working in parallel. In traditional construction, permitting, foundations and building are consecutive phases; here, manufacturing proceeds alongside the first two. The specific schedule is set out in the proposal, as it depends on the size, the system and, above all, the local council granting the permit.

Modular versus traditional construction

Those who have got this far are not usually choosing between two module manufacturers: they are deciding whether building their home in a factory makes sense. The honest comparison is not that one method is better, but that both methods fail at different points.

 Luxury modular homeTraditional construction
Where quality is decidedIn the workshop, under cover and against a plan, with junctions checked before the module is closed.On site, outdoors and by trades that pass through the site for a few weeks each.
The weatherAffects the day of assembly, not the construction itself: the factory produces the same in January as in July.Affects the entire schedule. Rain and cold halt entire phases.
Energy performanceAirtightness is a measured figure, because the envelope is built and tested under controlled conditions.Achievable, but depends on every junction being executed correctly, on site and first time.
TimeframeThe home and the plot progress in parallel; the airtightness result arrives within days.Strictly sequential: each phase waits for the previous one to finish.
Budget certaintyThe manufactured part is a fixed specification. Deviation is concentrated on the plot.Deviation is spread throughout the entire project and appears late.
Changes midway through the projectInexpensive until the breakdown of components is finalised; expensive from that point onwards. This is the real trade-off of the method.Possible later on, although every late change on site is paid for twice.
Plot conditionsAccess, crane positioning and module width are hard limits, and these are checked before the design stage.Almost any access will do, as materials arrive in small pieces.
Planning permission and regulationsIdentical. It is processed as a permanent dwelling: the Código Técnico (Spanish Technical Building Code) and the local council's by-laws apply equally, with no modular category or shortcut.Identical.
Read without commercial enthusiasm, the table shows that modular construction is the soundest method when the building envelope has to perform and the timeline has to hold firm, and the weakest when a lorry and a crane cannot reach the plot, or when the client wishes to keep redesigning the house whilst it is being built. We prefer to know which of these two scenarios applies to your project at the feasibility stage, not once the workshop has already started. The full breakdown of the comparison — systems, costs and timelines — can be found in the luxury modular homes guide.

Modular, prefabricated or industrialised

All three words are used as synonyms, and anyone searching for luxury prefabricated houses, industrialised housing or luxury modular housing is usually looking for the same thing: a house whose main part is manufactured in a workshop and then assembled on the plot. However, they do not describe exactly the same thing, and the difference matters when comparing offers.

What turns any of these into a luxury home is not the word used, but the project itself: bespoke architecture for the plot, integrated interior design, a building envelope that genuinely performs, and top-tier finishes. For legal, licensing, mortgage and warranty purposes, a modular home anchored to foundations is a home like any other, as detailed below.

What determines the price

This is the first question in almost every enquiry, and the one that is worst answered online, because any figure quoted in isolation is misleading. In the luxury segment there is no price per square metre that applies to every case: the same floor area can vary completely in cost depending on the structural system, the level of finish and, above all, on what the plot requires. That is why the budget is set on the specific project, not on a catalogue.

These are the variables that genuinely determine the final figure for a luxury modular home:

The most common budgeting mistake is comparing the price of a module with the price of a finished home. They are not the same thing, and the difference is almost always the items that do not appear in the brochure. Always ask for a line-by-line breakdown and the exclusions in writing: it is the only way to compare two offers on a sound basis. In our case, this breakdown is part of the proposal from the preliminary design stage onwards.

If you would like to see the detail of each item before requesting a proposal, we have covered this in the luxury modular homes guide.

Where we build

We work from Spain for clients throughout Europe, and we provide service in eight languages —Spanish, English, French, German, Russian, Polish, Dutch and Albanian—, with the project documentation in the client's own language.

Markets served: Spain, Germany, Austria, Switzerland, France, Belgium, the Netherlands and Luxembourg, Italy, Portugal, Greece, Ireland, the United Kingdom, Poland, Russia and Albania. Each country has its own technical guide to permits, building codes and climate, linked from its name.

In Spain we build throughout the entire country, including the islands (what changes when building here is explained in luxury modular home in Spain). The home is designed and manufactured in the same way anywhere in the country: what changes from one area to another is the local council procedures, the climate requirements of the Código Técnico (Spanish Technical Building Code) and the site access conditions. This is precisely what is checked during the feasibility phase, before any designs are drawn up:

If you are also considering buying a luxury property in Spain from abroad, we have prepared market-specific guides covering the legal process, taxes and financing for non-residents.

Guarantees, regulations and financing

This is worth clarifying from the outset, as it is the doubt that most weighs on the decision: a modular home anchored to a permanent foundation is a home like any other in every legal, tax and land registry respect. It is neither a demountable installation nor a prefabricated house for temporary use, and there is no separate modular regulation: it is designed, processed, inspected and delivered under the same rules as any conventional new build.

The objection regarding valuation falls away for the same reason: the valuer assesses a single-family home on urban land, not an industrial product. What is worth anticipating with the bank is the payment schedule, since workshop manufacturing brings forward outlays that, in traditional construction, would only be due later. This alignment between the construction schedule and the financing schedule is addressed in the proposal, before anything is signed.

Why Aurum Group

Current project: modular home in Pinoso (Alicante)

Our most recent project is a single-storey modular detached house in Pinoso, in inland Alicante province. Handover of the keys is scheduled for 20 November 2026, and it is a good example of the short timeframe made possible by factory manufacturing whilst the plot is being prepared.

ProjectDetails
TypeSingle-storey detached house
LocationPinoso, Alicante (Comunitat Valenciana, Spain)
Floor area150 m², single storey
StatusUnder construction · handover scheduled for 20 November 2026

Frequently asked questions

What exactly does a turnkey luxury modular home include?

The scope is agreed in writing in the proposal for each project. A complete turnkey service covers architecture and engineering, permit processing, foundations, manufacturing, transport and assembly, services, utility connections, finishes and interior design, through to handover ready to move into. When comparing quotes, check which items are excluded: foundations, utility connections, permits and site development are the ones most often left out.

Do you build on my plot?

Yes, that is the usual starting point. Before designing, we check the land classification, the available buildable area and site coverage, the setback requirements and access for special transport and cranes. If you do not yet have a plot, this analysis can be carried out on those you are considering before purchase.

Can a luxury modular home be designed entirely to a bespoke specification?

Yes. We do not work from a fixed catalogue of models: each home is designed with its own architecture, layout and interior design, tailored to the plot, orientation, views and local regulations. Modularity gives the project structure, it does not limit it.

Up until when can changes be made to the project?

You have freedom to make changes during the preliminary design and the detailed design (execution project). Once the module breakdown is finalised and manufacturing has begun, structural changes are no longer feasible, as the workshop works to fixed measurements; with finishes and interior design, however, there remains scope for changes until later stages.

Can a modular home be mortgaged?

Yes. It is a permanent home anchored to permanent foundations, it is registered in the Land Registry like any other property, and it can be financed under the same conditions. For the valuation, the standard technical documentation is provided: the approved project, the permit, certifications and schedule.

What guarantees come with the delivered home?

Those established by the Ley de Ordenación de la Edificación (Spanish Building Regulation Act) for any new build, with its terms covering finishes, habitability and structure, plus the compulsory building insurance and the guarantees provided by the manufacturers of fittings and equipment. Everything is set out in the handover documentation together with the building log book.

In which countries do you build luxury modular homes?

In Spain and in the main European markets: Germany, Austria, Switzerland, France, Belgium, the Netherlands and Luxembourg, Italy, Portugal, Greece, Ireland, the United Kingdom, Poland, Russia and Albania. We provide service in eight languages.

How does the process begin, and is there a cost for the first consultation?

The first consultation is free and without obligation. We review the plot and your requirements brief, discuss planning feasibility and, if it is a good fit, prepare a proposal with scope, an itemised budget and a timeline.

How much does a luxury modular home cost?

There is no price per square metre that applies to the entire segment. The figure depends on the plot, the floor area and number of storeys, the construction system, the level of finish and the items that fall outside the module: permits, geotechnical survey, foundations, utility connections and groundworks. The budget is set on the specific project and delivered as a line-by-line breakdown, with the exclusions in writing, as early as the preliminary design stage.

How long does a luxury modular home take?

The specific timeline is set out in the proposal for each project, as it depends on the surface area, the construction system and, above all, the local council granting the licence: this is the stage with the most variability and the only one that does not depend on the construction company. What shortens the timeframe compared with traditional building work is not working faster, but working in parallel: the modules are manufactured in the workshop whilst the licence is being processed and the plot's foundations are being laid, and assembly on the foundations is completed within days or a few weeks. The full timeline, stage by stage, can be found in the guide to luxury modular homes.

What energy rating can a luxury modular home achieve?

The rating on the certificate is not determined by the construction method, but by the design: it depends on the building envelope, the joinery, the installations and the climate zone, and is calculated for the specific home. What workshop manufacturing brings is that continuous insulation, the elimination of thermal bridges and airtightness are executed and verified under controlled conditions — and these are precisely the factors that determine the outcome. The performance level being sought is agreed at the preliminary design stage, as it dictates thicknesses, joinery and installations. Promising a rating before a project exists would not be a serious claim.

Is a modular home cheaper than traditional construction?

Not necessarily, and whoever promises this is usually comparing different things. In the luxury segment, the saving lies not in the price per square metre, but in the timeline, in the certainty of the budget and in the running cost of the home over decades: the manufactured portion is a fixed specification, so any deviation is concentrated in the plot rather than spread across the entire build. The most common comparison error is setting the price of a module against that of a finished home; they are not the same thing. Ask for an itemised breakdown by section and the exclusions in writing for both quotes.

Is a luxury modular home the same as a prefabricated house?

In practice, people search for them as synonyms, but they are not exactly the same thing. "Prefabricated" simply means that the components arrive ready-made from the factory and is usually associated with catalogue models; a luxury modular home is designed to measure for the plot, manufactured in a workshop in volumes or panels with the structure, insulation and installations already completed, and anchored to permanent foundations. For legal purposes, it is a conventional home: building permit, title deed, Land Registry entry and mortgage under the same conditions.

Do you build throughout Spain?

Yes, throughout the country, including the islands. The home is designed and manufactured in the same way anywhere in the country; what changes is the municipal permitting process, the climate requirements of the Código Técnico de la Edificación (Spanish Technical Building Code) and site access for special transport and crane. On the islands, sea transport of the modules is also factored into the schedule. All of this is checked during the feasibility phase, before anything is drawn.

Let's talk about your modular home

Free consultation on your plot and requirements brief — no obligation.

Get in touch now
Continue reading: Complete guide to luxury modular homes · Catalogue and specification schedule · Home · Casa modular de lujo en España · Viviendas modulares de lujo en Alicante y la Costa Blanca · Viviendas modulares de lujo en Marbella y la Costa del Sol · Viviendas modulares de lujo en Mallorca, Ibiza y Menorca · Casas modulares de lujo en Europa · Vivienda modular de lujo internacional · International luxury modular homes · Luxury modular homes in Europe